Skip to content
Nemorgi

Energy project simulator

Pick a location, choose solar PV or wind and get a first output estimate from public data by the European Commission (PVGIS) or NASA (POWER), with the project economics and their sensitivity.

Preliminary assessment

Resource data are multi-year averages, not live measurements. Output is an estimate and the economics depend on your assumptions. It's no substitute for a technical study or a grid access and connection study.
Cargando…

Calculation versions: energy-finance@1.0.0 y wind@1.0.0. Irradiation and PV output: PVGIS © European Union. Wind: NASA POWER project (NASA Langley Research Center). Cartography: Natural Earth.

How to use it

  1. 1Choose solar PV or wind and mark the location on the map (or type the latitude and longitude).
  2. 2Enter the capacity and configuration. For solar PV you can let PVGIS calculate the optimal tilt and orientation.
  3. 3Query the resource (PVGIS for sun, NASA POWER for wind) or enter it by hand if you have your own study.
  4. 4Replace the example economic values with those from your budget, contract or bill, and check the sensitivity.

How it calculates

  • Solar PV: monthly output from PVGIS (PVcalc) for 1 kWp with your losses, technology and angles, multiplied by the capacity (the PVGIS calculation is linear with capacity).
  • Wind: wind at hub height v(h) = v(50 m) · (h/50)^α; Weibull distribution with shape k and scale c = v̄ / Γ(1 + 1/k); generic cubic power curve between cut-in and rated speed; density correction for altitude; energy = average power × hours × availability × (1 − losses).
  • Output in year t = year 1 × (1 − degradation)^(t−1). Revenue = output × price, with annual escalation. OPEX = fixed per kW + variable per MWh, with escalation.
  • NPV = Σ cash flows / (1 + rate)^t, with the investment in year 0. IRR: the rate that makes NPV equal to zero. Simple payback, undiscounted.
  • LCOE = (investment + discounted OPEX) / discounted energy. Debt with constant payments; coverage = project cash flow / debt service.
  • One-year P90 = mean − 1.2816 × year-to-year deviation from PVGIS (assumes a normal distribution).

See the full methodology →

Verifiable example

1,000 kWp in Albarracín (Teruel; 40.407 N, 1.444 W) at the optimal 35° tilt, facing south, with 14% losses and 2025 silicon modules: PVGIS 5.3 gives 1,583.5 kWh per kWp per year, i.e. 1,583.5 MWh in the first year. With the example values (€700/kW, €15/kW·year rising 2%, 0.5% degradation, €50/MWh, 25 years and 6%): investment of €700,000, first-year cash flow of €64,175.74, NPV of €36,050, IRR of 6.57%, payback in 11.6 years and LCOE of €48.14/MWh. In the simulator the NPV can vary by a few euros: it requests the data for 1 kWp and PVGIS rounds it to hundredths.

Limitations

  • It's a preliminary assessment: it doesn't replace a resource study, a technical project or an installer's offer.
  • It doesn't assess grid access and connection: we have no capacity data, and being near a line doesn't mean there is capacity.
  • Wind uses a generic power curve and the monthly mean wind from a coarse-resolution reanalysis (about 50 km): real wind depends on terrain and obstacles.
  • Pre-tax results, without subsidies, network charges or an hourly price profile.
  • Solar output doesn't include nearby shading, trackers or batteries; it does include the terrain horizon PVGIS calculates.

What the paid levels will add

Compare the levels →
  • Pro· soon

    Several saved sites

    Compare locations and set-ups in one project.

    Coming in the Pro level · Coming soon

    Cloud projects, more capacity and reports without watermark.

    Designed for: People starting a business and less specialised companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Hourly profile and self-consumption with your load curve

    Upload your consumption and calculate surplus, savings and battery.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Technology Comparison Lab

    Compare technologies, hourly profile, capacity, constraints and costs under consistent assumptions.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Master· soon

    Mix and storage optimisation

    The lowest-cost combination of technologies and battery for your demand.

    Coming in the Master level · Coming soon

    Everything without practical limits: optimisation, Monte Carlo simulation, AI with your projects' context, API and licensed data.

    Designed for: Large companies, specialist consultancies and universities

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels